Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Roofing felt how to hipped troof.
Use two stacked shingles cut to form to start the ridge cap at the bottom of the hip ridge and then use one cap in each position up the ridge.
The bottom end of.
Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed.
Have one person lay shingles in the proper place and another person nail shingles down.
How to shingle a hip roof ridge will be done as follows.
Steep pitched roofs require the use of roof jacks work supports or platforms to assure safe footing while working on the roof.
If you want to keep your roof from getting potential water damage then you need to start your roofing project by adding flashing to the ridges and by adding strips of tin to the edges of your hip roof.
Get some friends to help you shingle the hip roof.
Place the 4 6 common rafters in their designated positions along the 2 longest walls and nail them firmly to the wall with a nail gun.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Roofing felt comes in rolls that feature.
Roof material staging devices such as roof jacks storage platforms and toe boards must be securely fastened to the deck substructure to prevent the roofing materials from slipping on or falling off the roof.
How to lay roofing felt on a hip roof step 1.
The reason why drip edge should be installed below the underlayment along the eaves of the roof is so that water does not get under the drip edge.
Start at the bottom of one side of the roof at the right or left edge.
When installing anything on a roof you need to follow the water rule the water rule means you consider where water will run when it s on the roof.
The first step in the process of erecting the hip roof is to get the ridge beam into place at the top of the roof.