Varied building systems have been developed to support vegetative covers on steeply pitched roofs.
Roof installation interply void tolerance.
Additional membrane s sheet to complete the roofing system.
Roof traffic in an effort to avoid the inherent danger associated with walking on a roof we recommend that only licensed and insured professional contractors traverse roofs.
Caution should be exercised to ensure personal safety and prevent damage to roof tiles that may void the warranty.
The area to be repaired should extend a minimum of 18 inches beyond the perimeter of the defect to provide an ample clean area on which to install the patch and tie it into the existing roof membrane.
The pressure developed in the void stretches.
Pitched roof systems sometimes merge into vertical facade vegetative techniques.
Section 3 truss installation 3 1 general 3 2 set out 3 3 lifting 3 4 first truss 3 5 subsequent trusses 3 6 erection bracing and tolerances section 4 roof bracing 4 1 general 4 2 battens 4 3 top chords 4 4 bottom chords 4 5 webs 4 6 top hat construction section 5 truss connections 5 1 hip ends 5 2 girder 5 3 gable end trusses.
Figure 2 poor interply bonding due to low application temperature a cap sheet b base sheet.
Roofing membranes for low slope application.
To install extensive vegetative roof covers on pitches steeper than 2 5 12 12 degrees supplemental measures will be required to prevent sliding instability.
During installation of hot bituminous systems care warns that improper mopping can produce voids in the membrane block drains and result in ponding water as well as void the warranty.
Replaced in a 1900 renovation the slate roof on the white house was replaced with sheet iron in 1804 the copper roof on the old church of christ in philly lasted from the 1830s to 1967.
Comply with all applicable local or national building and fire codes including any that may supersede this manual.
Prime concrete decks prior to application with pg 100 asphalt primer.
Installation procedures product and safety standards.
Pierce cautions that before roof repairs are hastily made the source of the ponding water should be investigated.
Apply over clean dry dust and debris free substrates.
When reroofing remove all prior roofing materials down to a clean debris free substrate and properly close off all abandoned roof penetrations.
Roof tiles broken by foot traffic should be.
Moisture trapped in the void expand.
Installation but they grow with time.