Scupper retrodrains detail drawing dwg 651 58 kb scupper retrodrains detail drawing dxf 686 85 kb.
Roof overflow scupper.
21500 rdg1 roof drain.
On the roof side overflow scuppers can be detailed similar to detail 10 5d.
21500 q91 roof drain.
Scuppers shall not have an opening dimension of less than 4 inches.
Permaspan roof to roof detail drawing dxf 249 76 kb permaspan roof to roof detail drawing.
25000 parapet scupper sleeve.
Cast iron w flashing clamp flange.
The detail shows an alternate method of constructing either type of scupper.
Green roof type with perforated standpipe.
When scuppers are used for secondary emergency overflow roof drainage the quantity size location and inlet elevation of the scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by section 1611 1.
Permaspan roof to roof expansion joint.
In its place are performance requirements to size and position the scupper to prevent the depth of ponding.
Flat roofs that do not drain over the roof edge and roofs that have parapet walls must utilize roof drains to get the water off the roof.
The scupper is locked and soldered to the closure flange on all sides.
25010 downspout nozzle.
Rough bronze w wall flange.
An overflow drainage system will be designed to function independently of the primary system to drain water from the roof.
Green roof drain overflow drain large sump flange.
The sides of the flange are sealed against the masonry.
Overflow drains and scuppers roof drainage.
In short a scupper is a detail that provides drainage to a roof system by allowing the water runoff from the roof to exit the roof through a metal edge parapet wall or through the deck into a downspout or leader not run through the interior of the building.
They will either be a part of the primary drainage system or they will be a part of the secondary overflow drainage system a primary drainage system is designed to remove water from the roof as quickly as possible.
The familiar prescriptive option from prior model uniform building code to simply make overflow scuppers three times the area of the roof drains and position them two inches above the low point of the adjacent roof is gone.
Where you have roof drains you are also required to have overflow drains.
Scuppers will play one of two roles in a roof system.