With tji joists z rwm 9 112 and 11 718 4 with 14 and 16 tji joist kerblock.
Roof nailing pattern tji.
Follow these five simple construction steps for roof sheathing and scroll down to see more details on each with installation hints and tips below.
Tools you will need for roofing from amazon bostitch coil nailer https amzn to 2u1v8e2 shingle remover https amzn to 2fzu5wf roof snake https amzn to 2.
Do not walk on joists that are lying flat.
Roof framing tji 110 tji 210 tji 230 tji 360 tji 560 joists warning.
Do not walk on joists until braced.
Tj 9001 installation guide for floor and roof framing with tji 110 210 230 360 and 560 joists.
Do not stack building materials on unsheathed joists.
In most cases 4 nails are adequate.
Properly fasten panels including fastening and spacing hints.
Rim board to tji joist 10d 0 131 x 3 one into each flange toe nail 10d 0 131 x 3 6 o c.
Ventilate the roof according to current building codes.
Red dots mark the nail holes for a 6 nail high wind nailing pattern on traditional 3 tab shingles note that the nails are just below the tar line.
Nail with 1q 1od nalls bearing blocking rim joists header opening with double tji joists load bearjng wall above must stack over wallbelc wl micro lam l v l.
Tj 9510 installation guide for floor and roof framing with tji s31 s33 and s47 joists east canada.
Csg tjcan12 simpson connector guide for trus joist products.
Filler block nail with 1q 1od nalls backerblock nail with 1o 1od nalls intermediate bearing with.
A roofing nail should have a minimum nominal shank diameter of 12 gauge 2 67 mm and a minimum head diameter of 9 5 mm.
Position the nails appropriately according to the shingle installation instructions.
Roofing nail should have a barbed shank until the head which eliminates nail pops blow offs and roof leaks.
A large nail head and heavier shank gauge provide greater holding power.
Tj 9001p installation guide for tji 110 210 230 360 and 560 joists in punjabi language.
Check the nailing surface is level.
For duration series shingles owens corning recommends using either a 4 or 6 nail fastening pattern depending on the roof s slope and building code requirements.
Stack only over beams or walls.
Keep your nails on either side of the gap and away from the middle of each individual shingle so that the gap in the shingle above doesn t expose the nail head.