1 adequately designed and spaced roof framing members 2 adequate lateral bracing to support.
Roof framing at top of wall.
The top plate can be either single or double.
Detail plates for studs doors windows and intersecting walls.
Tack top and bottom plates in place.
On center and sandwiched between top and bottom plates.
The gable ends of the structure want to hold the two ends of the ridge up.
As you shim and plumb each section of wall drive 16d nails through the top plate into the framing with a hammer or nail gun.
A wall is a collection of studs usually sized 2 4 or 2 6 equally spaced usually 16 in.
Double plating is most common on load bearing walls unless the roof rafters or trusses and floor joists stack directly over the studs in the wall then a single top plate can be used.
Scatter studs every 16 in.
The xs indicate king studs and double lines indicate cripples.
Add the length of the overhang beyond this mark and.
Most contemporary roof sheathing is either plywood or oriented strand board osb panels.
Measure your seat cuts.
Spaced wood sheathing is common for wood shingle roofs.
You should be able.
Nail the end studs to framing in the existing wall.
Score the shims with a utility knife and snap them off flush with the plate.
Ridge beam height above top of slab height of wall z.
That s why most of the ridge sagging occurs in the center of the roof page top photo.
Exterior roof sheathing serves the same purposes for roofing materials as wall sheathing does for walls.
Once the ridge beam has been positioned in place and supported by roof framing members you can determine the placement of a rafter by measuring down from the top of the beam y height and making a mark on the beam.
For the length of wall.
In this video i teach you how to frame a 16 o c.
While you re at it some carpenters.
We go over the stu.
As the ridge sags down and the centers of the front and rear walls push outwards at the wall top the photo above provides a graphic illustration of direction of the forces at work.
From bottom plates to top plates crowning studs and blocking for added rigidity.
The roof structure consisting of the roof framing roof decking sheathing.
Portant part of framing.
Fasten the bottom plate by driving 16d nails through it into the floor.
Roof framing and 3 adequate connections between the roof structure and the top of the wall to create a complete vertical load path.
Line up the square with the plumb line then rotate it 180 degrees realigning the square on the other side of the.
Nail studs to top plate.
For more about this see roof construction basics.
Pry up top plate.
Start by marking the plumb line the horizontal line that marks where the wall will meet the rafter.